Chennai’s road signs – a long and confusing story

Chennai's road signs are always changing. At considerable expense of our money. For a country which is ridden with poverty, corruption, terrorism, communal hatred and several such pressing issues, changing the street names or the quality of the sign boards are definitely not the issues which need to be dealt with on a priority basis

For my second blog, I would like to write about retro reflective sign boards.  The local administration during the erstwhile DMK regime had, in the final months of their tenure, decided to change the existing concrete street signs to  retro-reflective stainless steel sign boards. In the first phase in 2011,  over 1000 important roads across Chennai  sported these boards.

Months later, there was a change in the administration, when the AIADMK came to power. They suspected corruption in the  retro reflective sign boards project, and decided to paint the sign boards on the walls of houses as illustrated in the image below :

The idea of painting on the walls had its own drawbacks as explained by a citizen in this blog.

Subsequently the Chennai Corporation  chose to revert to the idea of putting up the retro reflective sign boards for reasons known only to them. Existing concrete sign boards and wall paintings were left as it is, and new boards were placed at road intersections across the city.

It has been only about five years since these new boards were erected, here are a few photographs taken by me to illustrate the state of some of these boards across the city:

I have been making calls consistently and escalating several issues relating to the quality of the work done, damage caused to these boards, etc with the local administration, and have managed to get the same rectified with relentless follow up petitions.. Here are some digitals relating to the work done

Vasan Street, Ward 70, Zone 6, Perambur, Chennai

Before  

After   

 

Venkatraman Street, Ward 70, Zone 6 , Perambur, Chennai  

Before  Complaint

 After  Complaint 

Before Complaint

After Complaint 

Between the 80s & 90’s the signboards made up of concrete was erected across the city of Chennai, these boards  are now way too low,  due to constant resurfacing of the roads without proper milling. The local administration could have easily lifted the existing concrete sign boards and repainted the same. These concrete boards had survived rough weather and were a durable and sustainable option. This would have saved the exchequer a great deal of money  and also in a way offered opportunities to several painters across the state.

For a country which is ridden with poverty, corruption, terrorism, communal hatred and several such pressing issues, changing the street names or the quality of the sign boards are definitely not the issues which need to be dealt with on a priority basis. If only our elected leaders felt the same way!

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Kere Habba 2020: Celebrating Kaikondrahalli lake and its ecology

Workshops, photography trails, storytelling sessions, organic food, 5 km run and a lot of fun – this is what Kaikondrahalli lake festival witnessed. Special eco-friendly medals made of lake reeds were awarded to all runners!

Kaikondrahalli Kere Habba entered its 6th edition this year. The Kere Habba has typically been a day long series of events from sunrise to sunset. It celebrates the gorgeous Kaikondrahalli Lake that is spread over 48 acres, 23 guntas on Sarjapur Road. Once a dumpyard, this lake has been a bio-diverse ecosystem for the last few years. The lake's rejuvenation was taken up by BBMP few years back with the help and efforts of local citizens. The lake has become home to myriad species of resident and migratory birds and other creatures.  To celebrate the lake, this year, a variety…

Similar Story

Bengaluru’s poor public transport utilisation needs urgent attention: B.PAC survey

Bengaluru took the top spot this year as the world’s most congested city with commuters expecting to spend an average of 71 per cent extra travel time stuck in traffic. According to the survey conducted by B.PAC, 33 % of the survey respondents said that they do not use public transport in Bengaluru becauseof lack of frequency. First and Last Mile Connectivity to Public Transport in Bengaluru

The city with a population of over 12 million has nearly 8 million vehicles on road as of 2020. The draft revised Master Plan for Bengaluru – 2031 states that the modal share of public transport in total overall trips is only 48% as against 82 % for Mumbai.A city such as Bengaluru which has only 42 Kms of Metro serviced  that too for limited locations and a negligible suburban rail service, an efficient bus transport system is the only most significant public transport system available in the short and medium term. Since the arrival of metro services in the…